IFITE OVERPASS 

This seems, by far, to be the best alternative for traffic decongestion at Aroma. Vehicles going to Zik Avenue from Ifite Rd, will not have to get to the existing flyover, causing more traffic congestion, but will move over a (proposed) overpass, across the Highway, through the JPC Nwanka Street (a.k.a. High Tension road) and turn left to meet the Enugu route of the highway, or move straight ahead to join Zik Avenue.

This alternative will be most effective as commuter vehicles can now move directly from Zik Avenue (a.k.a. Old Road) to Ifite without coming out to the junction.